Previous Topic

Next Topic

Book Contents

Book Index

Default Date

The default date can be altered by either typing the date into the box or selecting a date from the drop down calendar . Information entered within Vision+ will then assume the default date. Consultation Dates within Consultation Manager are not applied to Vision+ data entry and vice versa. Codes added before changing the default date will be unaffected. The default date is set to the current date by default.